BESCOM-Approved · Bengaluru

Stop paying
BESCOM bills.
Own your power.

Rooftop solar designed, installed, and commissioned by Solar Phase Energy. We handle BESCOM net metering, PM Surya Ghar subsidy, and every form in between.

50+
Bengaluru installs
₹0
Electricity bills possible
4.9★
Customer rating
25 yr
Panel warranty
4.9
★★★★★
Based on 47 verified reviews
SN
Suresh Nair HSR Layout
★★★★★
"5 kW done in 2 days, BESCOM net meter live in 5 weeks. Saving ₹4,200/month."
PR
Priya R. Whitefield
★★★★★
"Handled everything — BESCOM forms, subsidy. Zero headache for me."
AK
Anand K. Koramangala
★★★★★
"Best investment for my villa. Bills went from ₹5,800 to ₹320."
BESCOM-approved installer
PM Surya Ghar registered
Tier-1 panels only
Full subsidy assistance
AMC & monitoring
Interactive Calculators

Run the numbers

See your savings, EMI, and bill impact before you commit to anything.

5.0 kW
Recommended system
₹46,500
Annual savings
4.3 yrs
Payback period
₹11.6 L
25-yr savings
Monthly Bill — Before vs After
Currently paying
₹4,000
per month
After solar
~₹320
per month (est.)

Based on BESCOM avg irradiation 5.5 kWh/m²/day. Actual savings vary by shading, usage, and tariff revision. Get precise figures with a free site survey.

System Cost (after subsidy) ₹2,00,000
Loan Tenure 5 years
Interest Rate (p.a.) 6%
Monthly EMI
₹4,190
Your monthly bill saving
~₹3,100/month
EMI is covered by savings from day 1
₹2,51,400
Total amount paid
₹51,400
Total interest
₹9.35 L
25-yr net gain

EMI is indicative. Actual rate depends on lender and credit profile. Solar Phase assists with loan tie-ups with nationalised banks.

System Packages

Choose your system

All packages include BESCOM application, net metering, installation, and commissioning. Prices shown after PM Surya Ghar subsidy.

3 kW
2–3 BHK homes · up to 350 units/month
  • Monthly generation~360 units
  • Panels6 × 500W mono
  • Roof area needed~250 sq ft
  • Central subsidy₹48,000
  • Annual savings~₹28,000
₹1.10 – 1.40 L
After subsidy · GST included
Get Quote
Most Popular
5 kW
Villas, large homes · up to 600 units/month
  • Monthly generation~600 units
  • Panels10 × 500W mono
  • Roof area needed~400 sq ft
  • Central subsidy₹54,000
  • Annual savings~₹46,500
₹1.85 – 2.25 L
After subsidy · GST included
Get Quote
10 kW
Offices, shops, apartments · up to 1,200 units/month
  • Monthly generation~1,200 units
  • Panels20 × 500W mono
  • Roof area needed~800 sq ft
  • SubsidyAs applicable
  • Annual savings~₹95,000
₹4.00 – 5.00 L
Approx. · GST included
Get Quote

PM Surya Ghar — up to ₹78,000 off your system cost

Central government subsidy for residential rooftop solar. Solar Phase handles every step — registration, application, and subsidy tracking until it hits your account.

Check My Subsidy →
System SizeCentral Subsidy
Up to 2 kW₹30,000/kW
2 kW – 3 kW (additional)₹18,000/kW
Above 3 kWCapped at 3 kW benefit
Maximum subsidy₹78,000
Customer Stories

What Bengaluru homeowners say

Real customers, real savings. Update these with your actual Google reviews.

"

The Solar Phase team was incredibly professional. They handled all the BESCOM paperwork and the net meter was live in exactly 5 weeks. My 5 kW system generates more than my household needs — I'm actually exporting units.

"

I was worried about the BESCOM approval taking forever. Solar Phase tracked everything and kept me updated. Installation was done in a day and a half. My ₹5,800 bill is now ₹320. Unbelievable.

"

Very happy with the Waaree panels and Solis inverter they recommended. 3 kW system for our 2 BHK flat in Whitefield — we get about ₹0 bill 8 months of the year. The AMC team is also very responsive.

How It Works

From inquiry to power-on — every step

We own the entire process. You don't visit a BESCOM office, fill a single form, or chase a single approval.

01
📍
Day 1

Free site visit

Our engineer visits, checks roof orientation, shading, load profile, and existing wiring. Takes 45–60 min.

Same week
02
📐
Day 2–3

System design & detailed quote

Custom layout with panel brand, inverter type, and structure. PDF quote with full ROI and 25-year savings chart.

Within 48 hrs
03
🤝
Day 4–5

Agreement signing & advance

Customer signs the installation agreement and pays advance. We send a digital copy with e-signature.

Before procurement
04
🏛️
Day 5–6

PM Surya Ghar registration

We register you on the national PM Surya Ghar portal. This must happen before installation for subsidy eligibility.

We handle fully
05
📦
Day 6–10

Material procurement

Panels, inverter, mounting structure, cables, and BOS components ordered and delivered to site from authorised distributors.

3–5 days
06
🏗️
Day 11

Structure installation

Mounting structure fixed to roof. GI or aluminium structure as per design. Waterproofing done at all penetration points.

Day 1 of install
07
☀️
Day 12

Panel, inverter & wiring

Solar panels mounted, inverter installed, DC & AC wiring completed, earthing done. Site fully cleaned after work.

Day 2 of install
08
📋
Day 13

BESCOM net metering application

We file the net metering application to BESCOM immediately after installation. We track and follow up weekly until approval.

4–6 weeks for BESCOM
09
Week 6–7

Bidirectional meter & go-live

BESCOM installs your net meter. System commissioned, monitoring activated. Subsidy disbursed to your bank account within weeks.

Power-on day
BESCOM Net Metering

Export power, earn credits

With BESCOM net metering, surplus solar energy is exported to the grid and credited in your bill. You only pay for units you actually draw from BESCOM beyond what your solar generates.

  1. BESCOM application filedWe submit your net metering application on your behalf.
  2. Technical inspectionBESCOM's team inspects the installation — we coordinate this.
  3. Bidirectional meter installedBESCOM replaces your existing meter. This is the final step.
  4. Net metering activeYour solar exports are credited. Next bill will show the offset.
⏱ Typical BESCOM approval time: 4–6 weeks. We follow up on your behalf every week.

Sample monthly bill — before & after

Units consumed600 units
Solar units generated– 570 units
Net units billed by BESCOM30 units
Old bill₹4,650
New bill₹235
Annual saving on this example
₹52,980
Why Solar Phase

What we do differently

We are not a marketplace. Every survey, design, installation, and BESCOM follow-up is done by our own team.

🏗️

Own certified team

No subcontractors. Our engineers survey, design, and install. Accountability stays with us.

🔋

Tier-1 panels only

Waaree, Adani Solar, Vikram. No grey-market or off-brand stock, ever.

📄

Zero paperwork for you

BESCOM, PM Surya Ghar, net metering — we file, track, and follow up everything.

📡

Remote monitoring

Performance tracked via our monitoring platform. You get alerts if anything underperforms.

💳

Loan assistance

We help you apply for solar loans from nationalised banks at competitive rates.

🛠️

5-year AMC

Annual maintenance contract with cleaning, inspection, and priority support.

Service Coverage

All BESCOM zones in Bengaluru

We serve all of Bengaluru Urban and Rural — if you're on BESCOM, we can install.

WhitefieldElectronic CityKoramangalaHSR LayoutJayanagarJP NagarSarjapur RoadYelahankaHebbalMarathahalliBannerghatta RoadKanakapura RoadHennurDevanahalliTumkur RoadRajajinagarIndiranagarBellandurChandapuraDomlurRT NagarBegurHoskoteNelamangala+ All BESCOM zones
FAQ

Common questions

How much does rooftop solar cost in Bengaluru? +

After PM Surya Ghar central subsidy: a 3 kW system costs ₹1.1–1.4 lakh, 5 kW costs ₹1.85–2.25 lakh, and 10 kW is around ₹4–5 lakh. Exact pricing depends on panel brand, inverter type, and your roof structure. Our quote tool gives a detailed breakdown in minutes.

Can I get solar if I'm a tenant? +

Tenants can install solar with written consent from the property owner. However, for PM Surya Ghar subsidy eligibility, the BESCOM connection must be in the applicant's name. In most cases, the subsidy application should be in the owner's name even if the tenant is paying for installation.

How does BESCOM net metering work? +

BESCOM replaces your meter with a bidirectional smart meter. Solar power you consume is free; excess power you export to the grid is credited to your account at a fixed rate and adjusted in your monthly bill. You only pay for net units consumed from the grid beyond your solar generation.

Does solar work during Bengaluru's monsoon? +

Yes — solar panels generate power even on cloudy days, typically at 15–25% of peak output. Bengaluru has a GHI of ~5.5 kWh/m²/day annually, one of the best in India. The dry months (October–May) produce surplus that offsets lower monsoon months under net metering.

What is the PM Surya Ghar Muft Bijli Yojana subsidy? +

It's a central government scheme providing: ₹30,000/kW for the first 2 kW, ₹18,000/kW for the next 1 kW, capped at a maximum of ₹78,000 for a 3 kW+ system. The subsidy is credited directly to your bank account after BESCOM net metering is activated. Solar Phase handles the entire application.

How long does BESCOM net metering approval take? +

Typically 4–6 weeks from the date of application. We submit the application immediately after installation and follow up with BESCOM weekly on your behalf. You don't need to visit any BESCOM office.

Can I get a loan for solar installation? +

Yes. Solar Phase assists with solar loans from nationalised banks (SBI, Bank of Baroda, Canara Bank) at 6% p.a. for 5–7 year tenures. With EMIs typically below ₹5,000/month and savings of ₹3,000–7,000/month, solar is cash-flow positive from day one for most customers.

Get Started Today

Book your free site visit

Our Bengaluru engineer visits, assesses your roof, and gives you a precise quote — no obligation, no spam calls.

Response within 2 hours Free site survey No pushy sales calls Detailed PDF quote
✅ Yes, I own it
🏠 I'm a tenant
👨‍👩‍👦 Family member owns
You're eligible for PM Surya Ghar subsidy up to ₹78,000.

We'll call you within 2 hours!

Your request is in. Our Bengaluru solar engineer will call to schedule your free site visit at a time convenient for you.

🔒 Your details are never shared. No spam calls.